ALL PURPOSE VINYL STORAGE SHEDSA Product ofUSPUS POLYMERS INCUSPOWNER’S MANUAL / Instructions for AssemblySize 10’x 8’• All Weather Durable PVC• Won’t
6CCAB21B3RA11. Working outside Use (S1) screws to secure column to bases (B21) and (B3RA).10. Slide corner column (CCA) into side panel (SP ) pushing
7Fig.3: Use (S1)screws.Fix (CB3XA) to (CMA) columns.12. Stabilize the side panels with center bands (CB3XA) & (CB2A). Fix (FCB) fitting to corner
814. Stabilize the side panels with center bands (CB3XA) assembly. Fix center band fitting (FCB) to corner column (CCA) with (S2) screws. See Fig. 1Fo
9CCAB21B1LA17. Working outside use (S1) screws to secure column to bases (B21) and (B1LA).16. Slide corner column (CCA) into side panel (SP ) pushing
10CMAB22CCACB3XA1&53B21InsideCB2A4 & 6218. Stabilize the side panels with center bands (CB2A) & (CB3XA). Fix (FCB) fitting to corner colum
19. Insert the side panel (SP ) into the groove of column (CCA). Start at the bottom with panel at an angle then push into place.20. Slide door colum
C. Roof FrameParts Needed:22. Fix center band (CB4A) to (CDLA) and Base (B1LA) See figures (fig.1), (fig.2) and (fig.3).Fig.2: Use(S1) screw.Fix (C
133. Insert the door column fittings (FDCL) and (FDCR) left and right into the door columns (CDLA) and (CDRA). Fix with (S1) screws from inside the s
14Roof Structure Exploded ViewRS6XARS2ARS1ARS4XARS4XARS3XARS3LARS2ARS1ARS9ARS8AMJMJDSHRS10ARS11ARS11ARS12ARS12ARS10ARS7XARS5ARS5ARS2ARS3LARS3XAMJRS2AR
15Front roof structure assembly4. Assemble front roof structures (RS1A) 2 nos. and middlejoining support (MJ) together with 4 (S1) screws.RS1AStep 1Th
Note: Check all parts prior to installation.CODE DESCRIPTION QTYB1LA FRONT ‘U’ CHANNEL LEFT 1B1RA FRONT ‘U’ CHANNEL RIGHT 1B21 SIDE ‘U’ CHANNE
RS1ARS1ARS1ARS1ABack roof structure assemblyRS8ARS9ARS9ARS8ARS1ARS1AU-Channel OpeningU-Channel OpeningU-Channel Opening16Step 1These holes upRS2ARS2AR
1710a. Insert 90 degree joint (RJ) into the roof structure (RS3LA). Use a hammer to push in. Use (S1) screws to fix. Repeat on other end of (RS3XA). S
1813. Place the assembled front roof structure into position on top of door columns. Line up pre-drilled holes with door column fittings (FDCL) &
1915. Place the assembled back roof structure into position on top of middle columns (CMA). Line up pre-drilled holes with middle column fittings (FMC
20CCANoteNotice the U-channel up positionon roof structures (RS1A).fig.1fig.2RS3LARS3XARS3LARS3XARS2ASecure (RJ) 90 degree joint to (RS1A) with (S1) s
2117. Place the assembled roof structure (RS5A) & (RS6XA) intoposition on roof structure support (RS8A) at the left side of the shed.Use (S1) scre
22RS5ARS9ARS9ARS5ARS7XAfig.1fig.2RS5A19. Place the assembled roof structure (RS5A) & (RS6XA) into position on roof structure supports (RS9A) at th
RS7ARS5ARS4XARS7XAS721a. Attach the roof structures (RS4XA) 4 nos. to (RS5A), (RS6A) assembly and (RS5A), (RS7A) assembly with (S7) screws.fig.3fig.1R
22. Attach roof structure support (RS10A) and (RS11A) to roof structures (RS5A), (RS6XA) & (RS7XA) using (S1) screws.See fig.1,2 and 3.RS10ARS11AR
23. Attach the roof structures support (RS12A) with (RS5A) to (RS5A) and (RS6XA) to (RS7XA) with (S1) screws. See fig.1 and 2.fig.1RS6XARS7XA25RS12ARS
CB3XAMJCB3XACB3XAMJCB3XAMJRS6XARS2ARS4XARS4XARS3XARS3LARS2ARS1ARS9ARS8AMJMJDSHRS10ARS11ARS12ARS10ARS7XARS2ARS3LARS3XAMJRS2ARS1ARS4XARS4XARS5ARS5AFPLFP
3. Start attaching the roof panels from (FPL) corner side by sliding the roof panel (RP ) to roof structure. Locate the hole positions of the roof pa
27Fig.7Front of ShedRRSFig.2Fig.3RPFig.4Fig.5Fig.6FPRRPFig.8RRSFig.9RRS
1. Attach the doors left and right (see fig.1) with Loose pin hinges on door columns (CDLA) and (CDRA).E. DoorsParts Needed:(1) Door Left(1) Door Righ
292. After completing the panel assembly, applysilicone around the roof plugs. This is optional and should be done for heavy rain areas if needed.Note
30F. Optional Ventilation KitACCESSORIESCODE DESCRIPTION QTYVC VENTILATION COVER 2VCP VENTILATION COVER PIN 4VENTILATION COVER PIN (VCP)VENTILA
1. Shed or shed foundation should be placed on concrete footing by use of anchor bolt and nut. Using a carpenters square, line up corners. Align U-Cha
323. Attach each side panel (SP ) on top to the roof structure (RS1) and (RS3). Using a dia. 3mm (1/8”)drill with a power drill, make two equal dista
Duramax Storage ShedLimited Fifteen Year WarrantyU.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and o
A. Foundation & Base Frame1.Use pressure treated 2” x 4” (5x10cm) to build a foundation structure that has an outside dimension of96” x 127” (2438
Parts Needed:1.Slide door column (CDRA) into the U-Channel Base (B1RA) on the right side of the door. Line up the pre-drilled holes on (CDRA) Column w
B1RACCA0utsideS1B223. Slide corner column (CCA) into side panel (SP ) pushing the column to the side panel.4. Working outside use (S1) screws to secu
5.To stabilize the front panel attach center band (CB1A). Start with center band fitting (FCB), fix to corner column (CCA) with (S2) screws. See figur
7. Assemble the center bands (CB2A) & (CB3XA) with middle joining support (MJ). use (S1) screws. See fig. Make 2 sets.58. Assemble the two center
Kommentare zu diesen Handbüchern