Duramax Building Products 00811 Bedienerhandbuch

Stöbern Sie online oder laden Sie Bedienerhandbuch nach Nein Duramax Building Products 00811 herunter. Duramax Building Products 00811 Instructions / Assembly Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 31
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
• All Weather Durable PVC
• Available in Various Sizes
• Fire Retardant
• Rust or Rot Proof
• Maintenance Free
• Wide Double Doors
• Quick & Easy Assembly
• High Head Room for Garden Implements
• Never Needs Painting
• Good Insulator
Call us for any missing or damaged parts.
Do not return to the store.
Storage Shed
Storage Shed
Patent #416.091
OWNER’S MANUAL /
Instructions for Assembly
Size 5’ x 3’ with “Extension Kits”
Customer
Service Hotline
(800) 483-4674
www.uspolymersinc.com
Requires two people and takes under 1 hour for Installation.
PART 1
ASSEMBLING SHED WITH EXTENSION KIT
PART 2
ADDING EXTENSION KIT TO EXISTING SHED
Note: For shed with extension use this manual only.
Seitenansicht 0
1 2 3 4 5 6 ... 30 31

Inhaltsverzeichnis

Seite 1 - Storage Shed

• All Weather Durable PVC• Available in Various Sizes• Fire Retardant• Rust or Rot Proof• Maintenance Free• Wide Double Doors• Quick & Easy Assemb

Seite 2 - Limited Fifteen Year Warranty

4CMESPEBPB8. Insert the side panel (SPE ) into the groove of middle column (CME). Start at the bottom of the panel at an angle then push into place.9

Seite 3 - Parts List

511.To stabilize the side panel attach the center band (CB2E) and (CB3SB) assembly. Start with the center band fitting (FCB).Fix to corner column (CCE

Seite 4 - 5.2’ x 2.6’ Exploded View

613. Slide the middle column (CME) into the base pallet groove.Use two (S5) screws with (S6) washer to secure column to thebase pallet (BPB). See Blow

Seite 5 - One Extension Parts List

17. Stabilize the side panel with the center band (CB2B). Fix (FCB) fitting to the corner column (CCE). Follow the fig. (1 to 4).7Fig.4: Use (S1) scre

Seite 6

8SPECCEBPBBPFSPECMEBPBBPFSPES5S6CMECMESPEBPFBPBSPEFCLEFCLES5S6BPF18. Insert the side panel (SPE ) into the groove of column (CCE). Start at the botto

Seite 7 - A. Base, Walls & Columns

9Parts Needed:(2) RS1 Roof Structure (RS1E)(4) RS2 Roof Structure

Seite 8 - Overlapping Method

101. Insert the middle column fitting (FMC) into top of middle columns (CME) square tubing inserts. Fix the column fittings (FMC) to columns (CME) wit

Seite 9

5.2’ x 2.6’ ROOF STRUCTURE EXPLODED VIEW11RS1ERS1ERS2ERS2ERS2ERS2ERS3ERS3ERS5ERS5EDSHE

Seite 10

12ROOF STRUCTURE EXPLODED VIEW WITH ONE EXTENSIONRS3SBRS6ERS11ERS7ERS3SBRS4ERS4E

Seite 11 - Fig.4: Use (S1) screw

13Roof structure assembly5. Insert 90 degree joint (RJ) into the (RS3E) U-channel Roof support. Use a hammer to push in. Use (S1) screws to fix. Repea

Seite 12

Duramax Storage ShedLimited Fifteen Year WarrantyU.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and o

Seite 13 - Fig.1: Use (S2) screw

148. Place the (RS1E) roof structure into position on top of front columns. Line up pre-drilled holes with door column fittings (FDCL) & (FDCR). U

Seite 14

Inside Back of the ShedCME1510. Place the (RS1E) roof structure into position on top of back middle columns (CME). Line up pre-drilled holes with colu

Seite 15 - B. Roof Frame

1611. Insert the roof supports (RS3E) & (RS3SB) assembly into the roof structure (RS1E). See (fig.1 & 2)fig.2Secure (RJ) 90 degree joint to (R

Seite 16 - Inside of the shed

1714. Attach (RS2E) to roof structures (RS5E),(RS6E)assembly and (RS5E),(RS7E) assembly and (RS3)assembly. using (S1) screws.See (fig.1,.2 & 3).RS

Seite 17

15. Attach (RS11E) to roof structures (RS5E),(RS6E) and (RS7E) using (S1) screws.See (fig.1)1816. Attach the roof structures (RS4E) to (RS5E), (RS6E)

Seite 18

C. Roof panels1. Place facia panel (FPE) to front roof structure.19First insert all roof plugs with washers to the panels (left & right) then driv

Seite 19 - Roof structure assembly

20NoteKEYRoof PlugLeave holes unplugged at thispoint.NoteInsert roof plugs into roof panelsonly as indicated.fig.1RPFPEFig.3Fig.2Fig.4RRERREFig.5ATT

Seite 20 - Step 1 Step 2 Step 1 Step 2

Finish the roof panels witha little silicone glue around the roof plugs holes.Note215. Insert the sagging support (RS14E) from inside the shed by slid

Seite 21 - Inside Back of the Shed

PART 2: Adding Extension Kit to Existing Shed1. Remove the ridge cover (RRE) from the shed . See the figure.Remove this Ridge cover.Note222. Remove th

Seite 22

5. Detach back side (RS2E) from (RS5E).See the figure.234. Support the roof structure (RS5E) by using an appropriate support to avoid the roof structu

Seite 23

Note: Check all parts prior to installation.CODE DESCRIPTION QTYBPF BASE PALLET 1FCRE FRONT COLUMN RIGHT 1FCLE FRONT COLUMN LEFT 1CME MIDDLE

Seite 24

7. Detach (RS5E) from (RS1E).248. Detach 90 degree joint (RJ) from corner column fitting (FCC) from both corners. See fig.1.Detach 90 degree joint (RJ

Seite 25 - C. Roof panels

11. Detach the center band (CB2B) from the back wall of the shed. Follow the fig.2512. From outside back of the shed detach the corner column (CCE) fr

Seite 26 - Left side

5.2’ x 2.6’ Exploded ViewDLDRCCECMECB2ECB2ECB2BFCREFCLEBPFCCESPESPESPESPERS3ERS3ERS2ERS2ERS5ERRERPRPRS1ERS2EFPERS2ERS1ERS14ERS14EFPEDSHE

Seite 27 - D. Doors

Note: Check all parts prior to installation.CODE DESCRIPTION QTYBPB BASE PALLET 1CME MIDDLE COLUMN 2CB3SB CENTER BAND SHORT 2RS3SB RS3 ROOF

Seite 28

Exploded view with one extensionCMESPERS14ESPECB3SBRRERPRPCB3SBCMERS3SBRS14ERS4ERS4ERS3SBRS6ERS7ERS11EBPB

Seite 29

1. Place the base pallet (BPF) on the ground with the flat surface facing down.A. Base, Walls & ColumnsAll panels are clearly marked and care shou

Seite 30 - 7. Detach (RS5E) from (RS1E)

24. Slide front column right (FCRE) into groove of the the front fase pallet (BPF) on the right side of the pallet. Line up the pre-drilled holes on (

Seite 31 - Inside back wall

SPECMEBPFBPBSPES5S6CME7. Slide the middle column (CME) into base pallet groove. Use (S5) screws with (S6) washer to secure column to the base pallet.

Kommentare zu diesen Handbüchern

Keine Kommentare