• All Weather Durable PVC• Available in Various Sizes• Fire Retardant• Rust or Rot Proof• Maintenance Free• Wide Double Doors• Quick & Easy Assemb
4CMESPEBPB8. Insert the side panel (SPE ) into the groove of middle column (CME). Start at the bottom of the panel at an angle then push into place.9
511.To stabilize the side panel attach the center band (CB2E) and (CB3SB) assembly. Start with the center band fitting (FCB).Fix to corner column (CCE
613. Slide the middle column (CME) into the base pallet groove.Use two (S5) screws with (S6) washer to secure column to thebase pallet (BPB). See Blow
17. Stabilize the side panel with the center band (CB2B). Fix (FCB) fitting to the corner column (CCE). Follow the fig. (1 to 4).7Fig.4: Use (S1) scre
8SPECCEBPBBPFSPECMEBPBBPFSPES5S6CMECMESPEBPFBPBSPEFCLEFCLES5S6BPF18. Insert the side panel (SPE ) into the groove of column (CCE). Start at the botto
9Parts Needed:(2) RS1 Roof Structure (RS1E)(4) RS2 Roof Structure
101. Insert the middle column fitting (FMC) into top of middle columns (CME) square tubing inserts. Fix the column fittings (FMC) to columns (CME) wit
5.2’ x 2.6’ ROOF STRUCTURE EXPLODED VIEW11RS1ERS1ERS2ERS2ERS2ERS2ERS3ERS3ERS5ERS5EDSHE
12ROOF STRUCTURE EXPLODED VIEW WITH ONE EXTENSIONRS3SBRS6ERS11ERS7ERS3SBRS4ERS4E
13Roof structure assembly5. Insert 90 degree joint (RJ) into the (RS3E) U-channel Roof support. Use a hammer to push in. Use (S1) screws to fix. Repea
Duramax Storage ShedLimited Fifteen Year WarrantyU.S. Polymer Inc. will send a replacement part free of charge, in the event of material defects and o
148. Place the (RS1E) roof structure into position on top of front columns. Line up pre-drilled holes with door column fittings (FDCL) & (FDCR). U
Inside Back of the ShedCME1510. Place the (RS1E) roof structure into position on top of back middle columns (CME). Line up pre-drilled holes with colu
1611. Insert the roof supports (RS3E) & (RS3SB) assembly into the roof structure (RS1E). See (fig.1 & 2)fig.2Secure (RJ) 90 degree joint to (R
1714. Attach (RS2E) to roof structures (RS5E),(RS6E)assembly and (RS5E),(RS7E) assembly and (RS3)assembly. using (S1) screws.See (fig.1,.2 & 3).RS
15. Attach (RS11E) to roof structures (RS5E),(RS6E) and (RS7E) using (S1) screws.See (fig.1)1816. Attach the roof structures (RS4E) to (RS5E), (RS6E)
C. Roof panels1. Place facia panel (FPE) to front roof structure.19First insert all roof plugs with washers to the panels (left & right) then driv
20NoteKEYRoof PlugLeave holes unplugged at thispoint.NoteInsert roof plugs into roof panelsonly as indicated.fig.1RPFPEFig.3Fig.2Fig.4RRERREFig.5ATT
Finish the roof panels witha little silicone glue around the roof plugs holes.Note215. Insert the sagging support (RS14E) from inside the shed by slid
PART 2: Adding Extension Kit to Existing Shed1. Remove the ridge cover (RRE) from the shed . See the figure.Remove this Ridge cover.Note222. Remove th
5. Detach back side (RS2E) from (RS5E).See the figure.234. Support the roof structure (RS5E) by using an appropriate support to avoid the roof structu
Note: Check all parts prior to installation.CODE DESCRIPTION QTYBPF BASE PALLET 1FCRE FRONT COLUMN RIGHT 1FCLE FRONT COLUMN LEFT 1CME MIDDLE
7. Detach (RS5E) from (RS1E).248. Detach 90 degree joint (RJ) from corner column fitting (FCC) from both corners. See fig.1.Detach 90 degree joint (RJ
11. Detach the center band (CB2B) from the back wall of the shed. Follow the fig.2512. From outside back of the shed detach the corner column (CCE) fr
5.2’ x 2.6’ Exploded ViewDLDRCCECMECB2ECB2ECB2BFCREFCLEBPFCCESPESPESPESPERS3ERS3ERS2ERS2ERS5ERRERPRPRS1ERS2EFPERS2ERS1ERS14ERS14EFPEDSHE
Note: Check all parts prior to installation.CODE DESCRIPTION QTYBPB BASE PALLET 1CME MIDDLE COLUMN 2CB3SB CENTER BAND SHORT 2RS3SB RS3 ROOF
Exploded view with one extensionCMESPERS14ESPECB3SBRRERPRPCB3SBCMERS3SBRS14ERS4ERS4ERS3SBRS6ERS7ERS11EBPB
1. Place the base pallet (BPF) on the ground with the flat surface facing down.A. Base, Walls & ColumnsAll panels are clearly marked and care shou
24. Slide front column right (FCRE) into groove of the the front fase pallet (BPF) on the right side of the pallet. Line up the pre-drilled holes on (
SPECMEBPFBPBSPES5S6CME7. Slide the middle column (CME) into base pallet groove. Use (S5) screws with (S6) washer to secure column to the base pallet.
Kommentare zu diesen Handbüchern